Translate this page

FPUD awards manual transfer switch contract to Berg Electric


Thursday, February 7th, 2013
Issue 06, Volume 17.
Joe Naiman
Village News Correspondent


The Fallbrook Public Utility District awarded a contract to Berg Electrical to furnish and install a manual transfer switch for FPUDís portable generator.

FPUDís 4-1 vote Jan. 28, with Archie McPhee in opposition, authorizes a contract of $99,710.

"We have a portable generator, but we canít connect it right now at our office," said FPUD engineering and planning manager Jack Bebee. "We have nothing to plug it into."

The districtís main office was identified as a critical facility to maintain power during an outage, as remote operation of water and sewer pump stations and reservoirs are monitored and controlled from the office and the loss of power would eliminate remote monitoring and control. In order to utilize the emergency generator at the main office, a manual transfer switch is needed to disconnect the office from the main incoming San Diego Gas & Electric service.

"They can disconnect from SDG&E and connect to the generator," Bebee said.

FPUD completed the electrical design for modifications to the incoming Advertisement
Advertisement for Christ the King  Lutheran Church
[ Christ the King Lutheran Church ]
power system. FPUD issued the design to 11 electrical contractors and requested cost proposals. Due to the specialized experience needed because of the space constraints associated with the incoming power service and electrical connections, only two companies responded. Berg Electric submitted its $99,710 bid while Sloan Electric provided a bid of $178,651. Due to the price discrepancy FPUD staff spoke with Berg Electric representatives to determine whether the bidder understood the scope of the work, and FPUD determined that Berg Electric understood the work required and had extensive experience with similar projects.

McPhee voted against the bid because he felt that an automatic transfer switch was preferable. Bebee noted that the portable generator is moved between multiple facilities.

"Theyíve got to connect the generator anyway," he said.

FPUDís wastewater treatment plant has an automatic switch, as that facility is not always staffed and the automatic switch allows the transfer to power from the backup stationary generator without the physical presence of an FPUD employee.


 

0 comments


arrow Be the first to share your opinion on this article!
 

Add your Comment


Name

Images, Formatting, or HTML is not allowed : plain text only. You may post up to 5 website addresses within your comment.




Disclaimer

The Fallbrook Village News has tightened its' policy regarding comments.
While we invite you to contribute your opinions and thoughts, we request that you refrain from using vulgar or obscene words and post only comments that directly pertain to the specific topic of the story or article.
Comments that are derogatory in nature have a high likelihood for editing or non-approval if they carry the possibility of being libelous.
The comment system is not intended as a forum for individuals or groups to air personal grievances against other individuals or groups.
Please, no advertising or trolling.
In posting a comment for consideration, users understand that their posts may be edited as necessary to meet system parameters, or the post may not be approved at all. By submitting a comment, you agree to all the rules and guidelines described here.
Most comments are approved or disregarded within one business day.

RSS FeedFacebookTwitter



Advertisement for Stellar Solar





Subscribe




Most Commented


Reach Local Customers



The Fallbrook Village News The Fallbrook Village News
760-723-7319 - 1588 S. Mission Rd. Suite 200, Fallbrook CA 92028
All contents copyright ©2014
About Us
Earthquake Information
Business Listings
Contact Us
Letter to the Editor
Report a website error
Sitemap
Online Digital Edition
RSS Feeds
Login